Dang - Locals have brought the vehicular movement to standstill for an hour demanding dust control.
The construction of the one-kilometre road from Tulsipur Bazaar to Hattikhauwa Chowk under the Tulsipur-Ghorahi road section has not been completed though it was initiated long back.
Locals have been bearing the brunt of dillydally of the road construction. The dusty road has caused serious threat to the public health.
Demanding blacktopping of the road without any delay, the locals had halted the vehicular operation from 10.30 to 11.30 on Sunday morning.
"It is difficult for children to reach to the school. There is no place where dust has not covered", said Basanta Khadgi, a local.
Leave Comment