BP Highway Section to Open for Traffic by Mid-July

Kathmandu. Preparations are underway to open the Bhakundebesi-Nepalethok section of the BP Highway for traffic from the roadside by Asar 15 (mid-July), which was damaged by the devastating flood last Asar. The Road Division Bhaktapur is preparing to operate vehicles from the main under-construction road, considering the situation where the diversion from the river will cause problems during the rainy season. 

According to Suman Yogesh, chief of the Road Division Bhaktapur, since the current diversion is being washed away and the road is being obstructed even with normal rainfall, work is being intensified to operate vehicles from the upper part before the rainy season. He stated that their main goal is to operate traffic through permanent structures, not through diversions from the river during the rainy season. According to him, important structures will be completed by the end of Jestha, and vehicles will be running from the side of the main road structure from Asar. 

Uttam Dhungel, a representative of the construction entrepreneurs, said that the target is to open the road by Asar 15 by working day and night. According to him, out of 230 meters in the Baxiguna section, only 70 meters are left. It is being constructed in such a way that vehicles can be operated within the next 4-5 days. He said that although the flood caused damage three times, there is no shortage of materials and manpower at present.

The 29-kilometer road section from Bhakundebesi to Nepalethok, which was completely damaged by the flood on Asar 12 and 13, 2081, has been divided into three parts and contracted. Work is underway in the first section from Bhakundebesi to Charasaybesi, 11.8 km. The physical progress of this section, being worked on by Navakantipur Lama JV, is more than 30 percent.

The second section is Charasaybesi to Dalabesi, 8.5 km. Kamaljeet Evan JV is working on this. Similarly, in the third section, the Japan International Cooperation Agency (JICA) is constructing from Dalabesi to Barkhekhola, while a Nepali construction company is working on the 4-kilometer section from Barkhekhola to Nepalethok.

Along with reconstruction, this section of the BP Highway is now being upgraded from an 'Intermediate Lane' to a full two-lane standard road. According to Division Chief Yogesh, the width of the road will now be a minimum of 9 meters, with 7 meters for the main two lanes and 1-1 meter paved shoulders on both sides. Although a small traffic volume was estimated in the initial design, the Road Division Bhaktapur has informed that the road is being expanded considering the current needs. 

This specific news has been automatically translated by AI. As a result, there may be some inaccuracies or language errors.

Related Articles

Kathmandu Metropolitan City Prioritizes Urban Transport, Land Pooling, and Social Security in FY 2083/84 Policy

Kathmandu Metropolitan City Prioritizes Urban Transport, Land Pooling, and Social Security in FY 2083/84 Policy

Kathmandu. Kathmandu Metropolitan City has prioritized urban transport improvement, land pooling project management, and social...
Kathmandu Metropolitan City to Implement Urban Planning and Improve Public Services

Kathmandu Metropolitan City to Implement Urban Planning and Improve Public Services

Kathmandu. Kathmandu Metropolitan City will bring into implementation periodic, strategic and sectoral plans under urban...
Kathmandu Metropolitan City to Provide Concessional Loans for Youth Employment

Kathmandu Metropolitan City to Provide Concessional Loans for Youth Employment

Kathmandu. Kathmandu Metropolitan City is going to provide concessional loans with the objective of creating...
Bhaktapur Municipality Intensifies Siddhapokhari Renovation

Bhaktapur Municipality Intensifies Siddhapokhari Renovation

Kathmandu. Under its long-term 'Preserve Heritage' policy, Bhaktapur Municipality has intensified the renovation work of...
BP Highway Section to Open for Traffic by Mid-July

BP Highway Section to Open for Traffic by Mid-July

Kathmandu. Preparations are underway to open the Bhakundebesi-Nepalethok section of the BP Highway, damaged by...
Rastriya Swatantra Party Announces Final Candidate List for Second Phase of Officer Selection

Rastriya Swatantra Party Announces Final Candidate List for Second Phase of Officer Selection

Kathmandu. Rastriya Swatantra Party (RSP) has published the final list of candidates for the second...
Nepali Congress Establishment Faction Publishes 7-Point Proposal for Internal Consensus

Nepali Congress Establishment Faction Publishes 7-Point Proposal for Internal Consensus

Kathmandu. The establishment faction of the Nepali Congress has made public a 7-point proposal sent...
Nepal and India Enhance Tech Partnership with AI Seminar

Nepal and India Enhance Tech Partnership with AI Seminar

Kathmandu. A special seminar has been organized in Kathmandu with the objective of increasing partnership...