Nepal Rastra Bank to Withdraw NPR 40 Billion in Deposits Amid Excess Liquidity

Kathmandu. Nepal Rastra Bank (NRB) is withdrawing NPR 40 billion in deposits today (Wednesday). Due to the persistent excess liquidity, the central bank is again drawing deposits through a competitive bidding process for 88 days. The total deposits have now exceeded NPR 77 trillion.

The central bank has been withdrawing liquidity through deposit collection instruments and the Standing Deposit Facility (SDF) to manage excess liquidity and interest rates in the financial system. Only 'A', 'B', and 'C' class banks and financial institutions licensed by the central bank are eligible to participate in the bidding.

When allocating the amount for long-term deposit collection, the allocation will be made sequentially based on the interest rates bid by the counterparties, prioritizing the lowest bid rates until the called amount is met. As deposits are surging, the bidding today will take place through the online purchase system, and the interest rate will be determined through bidding. The principal and interest for the deposit collection instrument being bid on today will be paid on 2083 Jestha 10, the NRB informed.

The minimum bid amount is NPR 100 million, and the maximum amount will be up to the total called amount, divisible by NPR 50 million. Specifically, according to the central bank's Open Market Operations Procedure, if a long-term excess liquidity situation is observed in the financial market, the Monetary Management Committee can use the long-term deposit collection instrument with a maximum maturity of six months under structural open market operations on any day as needed to manage it and stabilize market interest rates.

Relying on this provision, the central bank has repeatedly used the deposit collection instrument. According to Nepal Rastra Bank, as of the second quarter of the fiscal year 2082/83, a total of NPR 28,712.40 billion (transaction-based) liquidity was absorbed through deposit collection bidding (NPR 1,425.50 billion), Standing Deposit Facility (NPR 27,086.90 billion), and Nepal Rastra Bank Bonds (NPR 200 billion), with a net absorption of NPR 28,699.90 billion after injecting NPR 12.50 billion in liquidity through the overnight liquidity facility.

In the same period last year, a net liquidity absorption of NPR 13,999.80 billion was carried out through various monetary management instruments.

 

This specific news has been automatically translated by AI. As a result, there may be some inaccuracies or language errors.

Related Articles

Indian Trade Barriers Halt Nepali Tea Exports, Threatening Industry and Livelihoods

Indian Trade Barriers Halt Nepali Tea Exports, Threatening Industry and Livelihoods

Kathmandu. Tea industries are starting to shut down due to policy and practical obstacles created...
Koshi Province Government Presents Budget of NPR 40.44 Billion for Upcoming Fiscal Year

Koshi Province Government Presents Budget of NPR 40.44 Billion for Upcoming Fiscal Year

Biratnagar. The Koshi Province Government has presented a budget of NPR 40.44 billion for the...
Gandaki Province Government Announces Budget of NPR 32.99 Billion for Upcoming Fiscal Year

Gandaki Province Government Announces Budget of NPR 32.99 Billion for Upcoming Fiscal Year

Pokhara. The Gandaki Province government has announced a budget of NPR 32.99 billion for the...
Finance Minister States Economic Slowdown Post-Jana Andolan

Finance Minister States Economic Slowdown Post-Jana Andolan

Kathmandu. Finance Minister Dr. Swarnim Wagle has stated that Nepal's economic activity has slowed down...
Nepal Finalizes 50,000 Metric Tons Chemical Fertilizer Import from India

Nepal Finalizes 50,000 Metric Tons Chemical Fertilizer Import from India

Kathmandu. The government has finalized the process for importing 50,000 metric tons of chemical fertilizer...
Bagmati Province Constructs 1,640 km of Blacktopped Roads in Six Years

Bagmati Province Constructs 1,640 km of Blacktopped Roads in Six Years

Makwanpur. The Bagmati Province government has constructed approximately 1,700 kilometers of blacktopped (paved) roads in...
Madhesh Province Government Prioritizes Production, Employment, and Social Justice in Upcoming Budget

Madhesh Province Government Prioritizes Production, Employment, and Social Justice in Upcoming Budget

Janakpurdham. The Madhesh Province government has prioritized increasing production and employment, human development, and social...
Bagmati Province Government to Present 10th Budget of Over NPR 66 Billion

Bagmati Province Government to Present 10th Budget of Over NPR 66 Billion

Hetauda. The Bagmati Province Government is preparing to present the budget for the upcoming fiscal...