Transportation resumes along Narayangadh – Muglin road
Chitwan - Transportation along the Narayangadh – Muglin route resumed at 4:30 am this morning after the removal of landslide debris at Kalikhola and Chepangdanda sections.
The vehicular movement came to a grinding halt after landslide cascaded down and the blocked the road on Saturday afternoon. The landslide struck 2.3 km south of Muglin.
The road was opened on a single lane after 8 pm last night and became fully operational only this morning, according to Chitwan's Superintendent of Police (SP) Deepak Thapa.
Leave Comment