Traffic resumes along Narayangadh-Muglin road section

Chitwan –Vehicular movement has resumed along the Narayangadh-Muglin road section since 11 am after clearing the landslide debris deposited in various pointed of the highway. 


The road section had been blocked due to landslide since 5 am this morning. The traffic on the road section resumed at 11 am, according to the District Police Office, Chitwan. 


A massive landslide had occurred at Ghumaune in Bharatpur Municipality-29 in Chitwan district, said police, adding that landslides also occurred in two other places along the road section- Top Khola and Jalbire. 


The two-way traffic has resumed normally after the debris in these places have been cleared. Police have urged one and all to be alert while travelling along this road section. 
--- 

Leave Comment